Jump to content

Recommended Posts

Posted

I know some enjoy the country feeling of Bonnie Brae's current state by The Stadium Formerly Known as Apogee. But I personally am excited to finally see the road be expanded to four lanes.

My question is, does anyone know if the Bonnie Brae/Airport Rd. intersection is going to be reconstructed and give both the north and southbound Bonnie Brae traffic the right-of-way?

  • Upvote 2
Posted (edited)
  On 3/1/2024 at 4:25 AM, Matt from A700 said:

My question is, does anyone know if the Bonnie Brae/Airport Rd. intersection is going to be reconstructed and give both the north and southbound Bonnie Brae traffic the right-of-way?

Expand  

From the drawings it appears yes, Airport Rd will become a turn off Bonnie Brae, with a traffic signal...

BBPH3 –PROJECT OVERVIEW Widen & reconstruct the 2-lane rural road to a 4-lane divided urban street between FM1515 and Parvin, continuing same along new alignment between Parvin and Roselawn.  Project includes both water and wastewater improvements as well as street lighting and a sidewalk/sidepath on either side of the street.  Traffic signals will be installed at Roselawn, Willowwood, and FM 1515/Airport Rd.

PROJECT SCHEDULE

August 15, 2023:  Council Award project to contractor

October 16, 2023:  Begin Construction \

April 15, 2026:  Estimated Completion (weather dependent)

Enlink gas line relocations and lowering may also affect construction schedule

63ac46e19ce25a9d28d54c2f98b508a7_BB_3_PR

Edited by NT80
  • Upvote 2
Posted
  On 3/1/2024 at 4:58 AM, NT80 said:

They should have done this 15 years ago before the stadium opened.  That tiny rural road going in there is pitiful.

Expand  

Amen… It’s about time !!   I can’t tell you how many times over the years my car nearly slid off into that gutter ditch while reaching for a Bud.  GMG

  • Upvote 2
  • Haha 5
Posted (edited)

Makes sense. Start this project in the middle of the season instead of waiting a month. 🤦‍♂️

Edited by UNTLifer
  • Upvote 5
Posted
  On 3/1/2024 at 5:20 AM, NT80 said:

From the drawings it appears yes, Airport Rd will become a turn off Bonnie Brae, with a traffic signal...

BBPH3 –PROJECT OVERVIEW Widen & reconstruct the 2-lane rural road to a 4-lane divided urban street between FM1515 and Parvin, continuing same along new alignment between Parvin and Roselawn.  Project includes both water and wastewater improvements as well as street lighting and a sidewalk/sidepath on either side of the street.  Traffic signals will be installed at Roselawn, Willowwood, and FM 1515/Airport Rd.

PROJECT SCHEDULE

August 15, 2023:  Council Award project to contractor

October 16, 2023:  Begin Construction \

April 15, 2026:  Estimated Completion (weather dependent)

Enlink gas line relocations and lowering may also affect construction schedule

63ac46e19ce25a9d28d54c2f98b508a7_BB_3_PR

Expand  

Nice, thanks! Couldn't find a more detailed realignment layout like this.

  • Upvote 2
Posted
  On 3/3/2024 at 4:14 AM, Rudy said:

Should have been done when the stadium was being built. 

Expand  

WHAT????   Plan ahead for traffic? Are you kidding? That's not the Texas way. Build those mega-housing editions first, then maybe......just maybe, worry about the traffic impact. Not to mention the stress on an over-stressed grid and water resources.....or the lack thereof.

  • Upvote 1
Posted
  On 3/3/2024 at 3:26 PM, SilverEagle said:

WHAT????   Plan ahead for traffic? Are you kidding? That's not the Texas way. Build those mega-housing editions first, then maybe......just maybe, worry about the traffic impact. Not to mention the stress on an over-stressed grid and water resources.....or the lack thereof.

Expand  

On a serious note, it is crazy to me that Waco just finished expanding I-35 to eight lanes while it forever for Denton to get to six, and Fort Worth to Denton is still only four.

Meanwhile I never have to exit there, but seeing all the development in Argyle and Robson Ranch area makes me mad for the people who have to suffer a two-lane FM 407 everyday.

  • Upvote 3
Posted
  On 3/1/2024 at 6:30 AM, UNTLifer said:

Makes sense. Start this project in the middle of the season instead of waiting a month. 🤦‍♂️

Expand  

You must not deal with government or construction projects often, much less government construction projects. They’ll be luck to start in April 2025. 

  • Upvote 1
Posted
  On 3/4/2024 at 5:46 PM, Moobs said:

You must not deal with government or construction projects often, much less government construction projects. They’ll be luck to start in April 2025. 

Expand  

So true. 

Posted
  On 3/1/2024 at 6:30 AM, UNTLifer said:

Makes sense. Start this project in the middle of the season instead of waiting a month. 🤦‍♂️

Expand  

The project already started last October and will go for 2 1/2 years...

October 16, 2023:  Begin Construction 

April 15, 2026:  Estimated Completion

Posted
  On 3/5/2024 at 1:25 AM, NT80 said:

The project already started last October and will go for 2 1/2 years...

October 16, 2023:  Begin Construction 

April 15, 2026:  Estimated Completion

Expand  

Anyone familiar with road construction projects inside Denton city limits will know that "Estimated Completion" date is entirely feasible, but without a doubt will not be met.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. Please review our full Privacy Policy before using our site.