Jump to content

Recommended Posts

Posted
11 hours ago, DentonLurker said:

Never thought I’d see the day. Now it’s time to get started on a shiny, new arena too!

Yep! Time to cement ourselves as a serious player in D1 hoop. Great move by the admin locking Grant down and paying the man what he’s worth.

  • Upvote 4
Posted

Well deserved.   No need for a new $90 mil arena (save the money for a Real football coach!!), the SuperPit is a great venue, just needs some tweaks.  

  • Upvote 7
  • Thanks 1
  • Haha 1
  • Confused 1
  • Skeptical Eagle 4
  • Downvote 2
  • 8 months later...
Posted
On 6/24/2022 at 11:20 AM, NT80 said:

Well deserved.   No need for a new $90 mil arena (save the money for a Real football coach!!), the SuperPit is a great venue, just needs some tweaks.  

So true Jeff.

  • Haha 2
  • Skeptical Eagle 1
  • Downvote 1
Posted
15 minutes ago, Andrew said:

He gone. Already talked on Monday 😞 

Maybe. He hadn't signed a contract with Tech yet and this new contract he signed with us makes it a LOT more expensive for Tech to get him. 

The old buyout was 40% of his $600,000 base while the new buyout is $1.5 million if he leaves before July. To match us it's going to cost Tech a minimum of $2.6 million. Tech certainly can pay that, but Mac is no longer the bargain he was on Monday. 

If Tech does take him, NT just got a nice bonus $1.5 million! 

 

  • Upvote 2
  • Lovely Take 1
  • Thanks 1
  • Confused 1
Posted
11 minutes ago, VideoEagle said:

Maybe. He hadn't signed a contract with Tech yet and this new contract he signed with us makes it a LOT more expensive for Tech to get him. 

The old buyout was 40% of his $600,000 base while the new buyout is $1.5 million if he leaves before July. To match us it's going to cost Tech a minimum of $2.6 million. Tech certainly can pay that, but Mac is no longer the bargain he was on Monday. 

If Tech does take him, NT just got a nice bonus $1.5 million! 

 

Thanks for spelling that out.  Much appreciated!

  • Upvote 1
Posted
45 minutes ago, Andrew said:

He gone. Already talked on Monday 😞 

Andrew what in the heck are you talking about?

As great a fan as you are, I sincerely doubt you get NT sports news before anyone else.  

  • Upvote 3
  • Thanks 1
  • RV 1
  • Skeptical Eagle 1
  • Eye Roll 1
  • Downvote 1
Posted
On 6/24/2022 at 12:20 PM, NT80 said:

Well deserved.   No need for a new $90 mil arena (save the money for a Real football coach!!), the SuperPit is a great venue, just needs some tweaks.  

I think that’s the problem. Renovations would cost more than just building a new arena. 

Posted
1 hour ago, VideoEagle said:

Maybe. He hadn't signed a contract with Tech yet and this new contract he signed with us makes it a LOT more expensive for Tech to get him. 

The old buyout was 40% of his $600,000 base while the new buyout is $1.5 million if he leaves before July. To match us it's going to cost Tech a minimum of $2.6 million. Tech certainly can pay that, but Mac is no longer the bargain he was on Monday. 

If Tech does take him, NT just got a nice bonus $1.5 million! 

 

So if he goes to Tech we get a CBI championship, NCAA game win, many conference championships, and possibly an NIT championship. Oh ya $1,500,000.

 Hope he stays but not mad at all if he is gone. 

  • Eye Roll 1
  • Downvote 2
Posted
3 hours ago, VideoEagle said:

He hadn't signed a contract with Tech yet and this new contract he signed with us makes it a LOT more expensive for Tech to get him. 

You do realize this thread and contract extension was in 2022, right?

  • Upvote 1
Posted
4 hours ago, Salsa_Verde said:

I think that’s the problem. Renovations would cost more than just building a new arena. 

OSU's arena is from 1938, but has been modified probably several times.  I agree we need some upgrades, like suites, for our (new or existing) building.  

The main issue, besides renovations, is the University control over scheduling for the SuperPit.  It is not exclusively a Sports venue.   Even if we do build a new "ExtraSuperPit", I do not think the current SuperPit will be demolished or renovated.  It is needed, as is, for other activities and graduations.

  • Upvote 1
Posted
10 hours ago, NT80 said:

OSU's arena is from 1938, but has been modified probably several times.  I agree we need some upgrades, like suites, for our (new or existing) building.  

The main issue, besides renovations, is the University control over scheduling for the SuperPit.  It is not exclusively a Sports venue.   Even if we do build a new "ExtraSuperPit", I do not think the current SuperPit will be demolished or renovated.  It is needed, as is, for other activities and graduations.

It's gotta be referred to as the "Super Duper Pit", right?

  • Thanks 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. Please review our full Privacy Policy before using our site.