Jump to content

Recommended Posts

Posted

A lot of unanswered questions.  Not under construction, but erected in like 6 hours, which makes no sense.  Somebody is about to pay big.

Posted

The good news is FIU was on spring break so it wasn't as bad as it potentially could have been.

The construction technique (qualifier I'm no engineer) as described doesn't sound that unusual. The Broadway Bridge in Little Rock was done in a similar manner with two spans built on barges and then floated into position. I am fully open to anyone knows this stuff better to explain I've misunderstood and those aren't similar.

Posted (edited)

It was designed to be a Cable Stay bridge, and they installed the entire length of the bridge with no supports??? The CUSAbbs board has a lot more info than I do.

 

Edited by SAGreenFan

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. Please review our full Privacy Policy before using our site.