Been meaning to make a post similar to this. It was great to sit and talk to him about all the items for the new stadium. A couple things stood out. 1. Like Flyer was speaking about earlier, the renewable parking lot is fascinating. It pretty mch concrete and grass. So during football season its a lot, then the rest of the year grass. Trash and recycling compactors on site to drive renewable energy, solar panels. 2. I would get the 2010 Kstate opener out of our heads. RV said think home opener 2011 and Louisville. 3. Talked about what the 35 corridor would look like. Pretty much is going to wipe out the sack and save and that whole side right there. It will bend around the Murchison and maybe encompass the Taco Cabana. I asked him if he was glad Taco Cabana was going and was that his idea. He smiled but that might have been a want to kill me smile. 4. They hope to bring the field turf over to the new stadium but probably not likely. If not it will be used outdoors for the practice field.